Night 2 - Hwy 86 Improvements
Traffic control in place at 8 p.m. ESS began stripping top soil and grading operations along the North side of Hwy 86. Proof rolling was completed at 3:30 a.m. One small area was found to be removed and replaced with adequate fill material. Edge treatment was maintained or installed throughout the project. Cleaning operations were completed and traffic control was removed by 6 a.m.
Before Grading Operations. East of Lot 8 Entrance
Weather 8 - 30- 2022