Thunder Ridge - 10/5/22

Image
Beran crew getting the footings for the 3 parking lot entrance signs ready for concrete. ESS crew got the ditch all finished up today. Just needs seeded. View from entrance. View looking west. West portion that was done last.

Thunder Ridge - 10/4/22

Image
East portion of the work is completed. Just need to seed it. Crew has moved over to the west side to get it taken care of. Ran in to check with the concrete crew as they get some footings ready for the parking lot signs. Plan to pour these tomorrow.

Thunder Ridge - 10/3/22

Image
ESS crew working on getting the ditch cut in for MoDot. View from the entrance. Looking west. Went in and spoke with the concrete crew about the plans this week and going forward now that the event is over with.

Thunder Ridge - 9/28/22

Image
Striping at the new south entrance. Parking lot 4A getting striping done today. Survey crew marking the layout now. Entrance coming off of the north pedestrian trail. View of the north suites. View of the south suites. Stage and floor level seating getting set up. Concert starts tomorrow and runs through the weekend.

Thunder Ridge - 9/27/22

Image
Chip & seal going down on parking lot 4A. Turf has been installed in front of north suites. Prepping the south suites for turf install. Springfield Striping at the south entrance. Getting their measurements. View of the area where the ditch is supposed to be cut in. Other side should have ditch line as well. Supposedly an agreement has been made to wait until after the concert to fully complete this part of the job.

Thunder Ridge - 9/26/22

Image
Digging out area in front of suites to install turf. Building up parking lot 4A. Bringing in the base to get spread and compacted. Base getting rolled as it’s spread. Compaction testing done once the lot was compacted and had good results. Ready for chip and seal.